Difference between cofferdams and caissons
Cofferdams and caissons are both structures that are used when undertaking construction works in areas submerged in under water.
The main difference between the two is that a cofferdam is a temporary structure which is removed after completion of the work, whereas a caisson is built to remain in place as part of the completed structure.
The aim of a cofferdam is to be as watertight as possible to create a dry area in which to carry out the required works, or at least to limit water ingress to a safe level that can be pumped away.
A caisson is typically a box-like structure made of materials such as timber, steel, masonry and reinforced concrete. It may be constructed onshore then floated to the required location, where it is sunk into place, enabling access to the bed to undertake works.
The type of structure being built will determine whether a caisson or a cofferdam is most suitable. The two principal factors influencing the choice are the ground conditions and the depth to which the work is to be taken. In general, cofferdams are suitable for depths of up to 18 m below high water level, while caissons are more suitable for greater depths.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.